Duncannon Road Widening, Phase II
(Mr. Polepalli was involved in the following tasks as an employee of another firm)
Following Traffic Engineering services were provided on the project:
- Report writing
- Maintenance of Traffic Plans and Notes
- Capacity Analysis
- Signalized and Unsignalize analysis for A.M. and P.M. peak for existing conditions as well as for the design year
- Multilane & Two Lane Analysis
|