Project Experience » Sanitary Sewer

Glenview Bluff Water Quality Treatment Center Elimination Project

Client: MSD, Louisville, KY


Project Scope:


       Involves in designing a 1,600 LF of 2.5” force main and eliminate an existing water quality treatment plant and install a grinder pump and odor control equipment. This proposed force main connects an existing 8” gravity sewer


Critical Design Elements:


       Densely populated neighborhoods, utilities, crossing a two-lane highway, close proximity of fully matured trees.

Construction Cost: $400K