2nd Street Widening Phase II Project

(Mr. Polepalli was involved in the following tasks as an employee of another firm)

Following Traffic Engineering services were provided on the project:

  • Capacity Analysis
    • Signalized and Unsignalize analysis for A.M. and P.M. peak for existing conditions as well as for the design year
  • Traffic Signal Design and construction plans
    • Mast Arm Assembly
    • Coordinated with manufacturers of singal poles to develop specifications
  • Utility Coordination
  • Lighting in conjunction with Traffic Signal Poles
  • Coordinated with Metro Louisville Traffic Engineering Department
  • Necessary signing was also provided in conjunction with the signal plans