Klondike Interceptor Project

 Client: MSD, Louisville, KY

 

Project Scope:

   Involves in designing a 3,400 LF of 36” gravity sewer interceptor connecting to Hikes Lane Interceptor on the downstream end and Jeffersontown Branch 1, 24” force main on the upstream end. 120 LF of 48” tunnel under a four-lane highway.

 

Critical Design Elements:

  Densely populated neighborhoods, utilities, crossing a four-lane highway, Major blue line stream crossing, close proximity of monitoring wells, fully matured trees.

Construction Cost: $1.5 million