Duncannon Road Widening, Phase II

(Mr. Polepalli was involved in the following tasks as an employee of another firm)

Following Traffic Engineering services were provided on the project:

  • Report writing
  • Maintenance of Traffic Plans and Notes
  • Capacity Analysis
    • Signalized and Unsignalize analysis for A.M. and P.M. peak for existing conditions as well as for the design year
    • Multilane & Two Lane Analysis