Glenview Bluff Water Quality Treatment Center Elimination Project
Client: MSD, Louisville, KY
Project Scope:
Involves in designing a 1,600 LF of 2.5” force main and eliminate an existing water quality treatment plant and install a grinder pump and odor control equipment. This proposed force main connects an existing 8” gravity sewer
Critical Design Elements:
Densely populated neighborhoods, utilities, crossing a two-lane highway, close proximity of fully matured trees.
Construction Cost: $400K |